Timetable: Small half baths on the main floor to retrofeet can take 1 to 3 days depending on the size. Main bath total reno's 3 to 10 days. Ensuite bathroom complete renovations 5 days to 3 weeks relative to the size and features with lighting, infoor heat, cabinets, tiling, and solid countertop surfaces. On major improvents adding external square footage by bumping out walls allow 2 to 3 weeks for city permits.

Budget: 1 Small main floor half baths, using off the shelf materials for plumbing, tile, cabinets,exhaust fan, and painting starting $2500. and upwards. Main bath reno's with the same specs start at $4500 while Ensuite bathroom renovations starting $6000. Basement bathrooms the use of existing plumbing drainage prices the same, relocating and installation of new drainage waste and venting, removal of existing ceiling finish and replacement extra.

Budget 2 Main floor half bath upgrade in materials to plumbing fixtures, wider tile selection, made to measure cabinets, lighting and exhaust fans begining at $4000. Main bath sames specs starts around $6500. Ensuite package in these specs start from $9500. More Contact us for a quote

Bathroomdesignideas16

Quality, Innovation, Reliability and Craftsmanship in Calgary